Leith Connections

Foot of the Walk to Dock Street - walking wheeling and cycling route

The route was officially launched on 18 March 2026.

It features

  • a protected cycle route
  • improved pavements
  • upgraded side street crossings
  • better public spaces to spend time in
  • sustainable drainage features such as rain gardens
  • new trees and plants.

You can see the design of the route between Foot of the Walk and Dock Street in our General Arrangement drawing. 

Photo of two way bike lanes on tarmac with white line separating each direction, leading up to buildings in the background.

 

Photo with cycle lanes on setted street with direction signs, barriers, railings and river in the background

 

Leith Connections logo