Foot of the Walk to Dock Street - walking wheeling and cycling route
The route was officially launched on 18 March 2026.
It features
- a protected cycle route
- improved pavements
- upgraded side street crossings
- better public spaces to spend time in
- sustainable drainage features such as rain gardens
- new trees and plants.
You can see the design of the route between Foot of the Walk and Dock Street in our General Arrangement drawing.

